An important aspect of site preparation is establishing finish floor elevation for your post frame building.
Establish finished floor height are.
N note that any below bfe finished areas includ ing foyers will violate nfip requirements may sustain unreimbursable flood damage and make the building subject to increased flood insurance premiums.
I am thinking i need door height 2 5 or 2 75 so we ll say 82 75.
The finish floor is then considered ff 0 0.
Once you build a home with 3 floors you run into fire safety requirements 1 subfloor plywood 2 layers 5 8 rock etc.
Once the finish floor elevation is established the other project elevations are based off the finish floor.
Tile flooring is water resistant and durable when combined with backer board which is impervious to moisture and helps create a flat base.
1 the finished floor level ffl is marked on the plans as 35 35 above sea level.
Therefore as the ffl should have been at 35 35 at no point should it have been below ground level.
The concrete depth e g 4 or 8 will dictate how high or low your grade board will be.
Installing tile raises the surface level of the floor.
They way i understand it is if your ff finish floor is above a predetermined height usually36 your first floor now becomes your second floor and your second floor becomes your 3rd floor.
From the contour lines on the overall plot layout plan the highest gradient intersecting with the unit should have been somewhere around 35 2.
I just dont want to have to trim all of the doors or special order them when i can easily modify the rough openings if i need to now.
Or do i just add in more space for the finish floor.
This is the finished floor level.
Add the combined height of the architectural floor material substrates and adhesives to the structural floor height.
Typically the building s finish floor elevation height of the floor is established from the civil drawings by the surveyor.